Theory:
The Vertical Composting Unit (VCU) technology comprises of fully enclosed aerobic composting system that suits the processing of kitchen waste of small quantity. Composting takes place inside the modular chambers .The process is continuous with waste being loaded into the top of the chamber and stabilized material removed from the bottom.. The unique vertical orientation of the VCU processing chamber enhances a natural process, with aeration provided by fan mounted on top of each chamber. Odor control is by way of using a biofilter and leachate is not produced. The VCU offers low operating costs due to low energy, maintenance and labor costs it has a small footprint and offers great flexibility as it's modular design allows it to be easily expanded as collection systems are expanded and the volumes of waste are increased.
STANDARD COST OF ITEMS:
Quantity of waste = 75kg/day
Scope of supply of VERMIS INDIA to Eastern ENVO:
Sr No | Item | Make | Qty | Cost(Rs.) |
01 | Screen for segregation of waste | Vermis India | 01 |
|
02 | Shredding machine | Vermis India | 01 |
|
03 | Vertical Composting Unit , MS vessel with FRP inside, with motorized augur, Ventilating Fan, Odor control Bio Filter, inlet door, outlet door, leachate collection pipe | Vermis India | 01 |
|
04 | Consultancy cum supervision, includes drawings for excluded items and travel | Vermis India |
|
|
|
|
| Total |
|
Add Taxes
1. SERVICE TAX: EXTRA will be charged as and when required
2. T.D.S may kindly be deducted as source
EXCLUDES:
| Excluded Items |
|
01 | Collection platform, B/W |
|
02 | Storage Room for prepared compost for 25 days with fresh air ventilation and odor control filters, B/W |
|
03 | Packaging Machine, weighing machine |
|
04 | Waste Water Treatment plant to Treat Lechate, 1 No |
|
05 | Boundary wall |
|
06 | Roads |
|
| Total cost of works |
|
b} Variable Cost
C | Variable Cost |
|
01 | Carrying/transportation, processing |
|
02 | Packing Material |
|
03 | Labour charge@20.000/month |
|
04 | Advertise/leaflet/stationary |
|
05 | Office staff @ 20,000/month Municipal Engineering Specialist
Agriculture Specialist |
|
06 | Fuel and Miscellaneous operating cost |
|
| Total variable cost |
|
Payment terms:
Material supply:
40% advance alongwith work order
60% against proforma invoice before despatch
Consultancy:
60% as advance
30% after submission of all drawings
10% after erection and commissioning
For VERMIS INDIA
SYED RAKIB HUSSAIN
09899377953
Call me for any more informations required by you.